Jifeng Electronics: Water Project Application Case of Nanjing University of Aeronautics and Astronautics
[ad_1]
The first phase of the water control project of Nanjing University of Aeronautics and Astronautics includes a public bathroom and a boiling water room. The first phase of the project has more than 250 water controllers. The project has been officially put into use and passed the acceptance.
This project adopts the split network timing water controller of Hi-Feng Technology, and the split-type water controller adopts the innovative design of 86 cassette specifications. The built-in installation is adopted throughout the country, which reduces the damage to almost zero. The overall circuit is all built-in. Make the bathroom beautiful and generous. Since the country began to advocate energy conservation, saving water and electricity has become one of the important tasks of the school. The various types of water controllers developed by Hifeng Technology in response to national policies have played a significant role in energy conservation for various enterprises and institutions.
Project site pictures:
Public bathroom scene
Single water control
Boiling water room
[ad_2]