Hunan Changsha Telecom Building Intelligent Monitoring Project
[ad_1]
With the development of technology and cities, life is becoming more and more comfortable. The wireless products developed by Xinli Technology are designed to simplify people’s lives and improve work efficiency. In this thriving era, intelligent building monitoring has also become a daily topic for people. Changsha, Hunan The automated monitoring of the equipment room that China Telecom cooperates with our company is a small representative.
Intelligent monitoring requirements of Hunan Changsha Telecom Building (Equipment Room):
In each important part of the equipment room, install smart temperature and humidity sensors to record the temperature and humidity curve for managers to inquire. Once the temperature and humidity are found to be out of limits, an alarm will be activated immediately to remind the managers to adjust the working settings of the air conditioner or adjust the equipment distribution in time. The working setting value of the air conditioner can also be adjusted automatically.
The input signals from the installed infrared detectors and smoke alarms are transmitted to the smart gateway through the wireless measurement and control device and then sent to the external network server through the DTU for real-time monitoring. At the same time, it sends out a sound alarm signal, sends a mobile phone SMS alarm, and an LED screen. Alarm, if the network fails, it can also send out an audible alarm signal.
The main realization of this project Xinli Technology:
1. The wireless measurement and control device is used to send the input signals of the smoke alarm sensor and the infrared sensor to the smart gateway. At the same time, the data of the smart temperature and humidity sensor is also transmitted to the gateway. The smart gateway is converted into a 3G wireless signal through DTU and transmitted to the GPRS base station and public network. Convenient for remote monitoring.
2. You can send instructions through the server to control remote equipment at any time, without personnel on duty, to achieve the state of intelligent monitoring of the building.
Project plan structure diagram:
[ad_2]