Modern logistics solution application implementation case

SaveSavedRemoved 0
Deal Score0
Deal Score0

[ad_1]

 Warehouse distribution

Guangzhou Maogang warehouse, 11,000 square meters

Maogang warehouse operations

Daily shipment volume: 2500 boxes

Dismantling and distribution business accounts for about 40%

More than 3000 varieties of delivery

More than 800 delivery customers (mainly hospitals)

  Project planning

Agree to plan/distribute implementation

Phase 1: WMS+RF (Warehouse System and Radio Frequency Equipment System);

The second phase: MHE+WCS (conveyor belt and sorting channel equipment);

Phase 3: TMS (Transportation System Integration);

The fourth issue: AS/RS (Stereoscopic Library).

 System Brief

 1. Modern logistics management system

Support third-party multi-owner management

Complete parameterized strategy formulation

Comprehensive barcode management

Real-time job scheduling monitoring

Efficient integration capabilities

 2. Radio frequency (RF) system

A perfect WMS is inseparable from the support of the RF system. Because of the efficient operation of WMS. It is based on fast, accurate and dynamic acquisition of cargo processing data as the basis of its system operation. The RF system makes WMS real-time data processing possible, which greatly simplifies the traditional workflow.

The RF system uses JAVA technology, runs on the WINCE operating system, and uses TERMINAL terminal services to fully highlight the characteristics of simple use, convenient deployment, fast transmission speed, and real-time data exchange.

 3. Automatic conveying and sorting system (WCSPLC)

The automatic conveying and sorting system is mainly used in the sorting, review, conveying and path sorting parts of the logistics center. Its general composition is as follows:

Screen conveying capacity: up to 3000 boxes per hour, vertical lifting {continuous type}: 800 boxes per hour;

Shipment sorting processing capacity (automatic sorting): 1000 boxes per hour;

The WCS configuration is flexible, and it can be connected to different customer information systems + WMS, ERP, etc.;

The third floor of the logistics center: dismantling and sorting, rechecking and consolidation, empty container recycling; and electric control main control cabinet;

WCS server (together with WMS on the second floor of the logistics center);

The third floor to the first floor of the logistics center: vertical conveying (outer wall of the building);

The first floor of the logistics center: shipping line sorting.

 4. Customer relationship management (ECRM) and decision analysis system

Project realization value: improved customer satisfaction; improved real-time and accuracy of information data; optimized storage location distribution and full load; unified outbound transportation scheduling planning; ease and accuracy of inventory inventory; automatic multi-level replenishment

1

[ad_2]

We will be happy to hear your thoughts

Leave a reply

RFID made in China
Logo
Enable registration in settings - general
Compare items
  • Cameras (0)
  • Phones (0)
Compare