Anhui University of Technology Library: Construction BIM Collaborative Management

SaveSavedRemoved 0
Deal Score0
Deal Score0

[ad_1]

The project is located in Wuhu, a national open city, with a total construction area of ​​56,397.12 square meters, and the main functions are libraries, archives, research centers, etc. The project construction party uses the EBIM cloud platform as the main tool for collaborative management in this project, collects feedback and solves on-site problems through the mobile terminal, and uses BIM+ QR codes to track and control the progress of materials.

BIM collaborative management

Lightweight browsing of on-site BIM models on the mobile terminal, bringing each BIM model to the site for comparison with the physical building, and the site can be constructed according to the model, and if there is any doubt, the model can be communicated in time to achieve consistency between the model and the site.


Anhui University of Technology Library: Construction BIM Collaborative Management

Save the model viewport of each problem node on the spot, and post it with the topic @Relevant responsible person, and find the location of the model and solve the problem in time on the spot.


Anhui University of Technology Library: Construction BIM Collaborative Management

BIM+ QR code

BIM + two-dimensional code realizes on-site fine management, through EBIM to carry out material tracking, orderly and efficiently track and query the construction progress, and control the overall progress of the project.


Anhui University of Technology Library: Construction BIM Collaborative Management

1

[ad_2]

We will be happy to hear your thoughts

Leave a reply

RFID made in China
Logo
Enable registration in settings - general
Compare items
  • Cameras (0)
  • Phones (0)
Compare