Great building automation helps five-star hotel energy-saving management
[ad_1]
The Jiaxing Hangzhou Bay Seaview Hotel project is located in Hangzhou Bay, the golden bay of Zhejiang. It is adjacent to the Jiulong Mountain Manor known as the “Oriental Venice” and the world’s first Hangzhou Bay Bridge. It has a superior geographical location and convenient transportation environment. .
As a key construction project of the government in 2008, the hotel has a total investment of about 300 million yuan and consists of a 22-story single main building and three 3-story auxiliary buildings. The hotel has a total of more than 280 guest rooms, large banquet halls in Chinese and Western styles, bars, swimming pools, KTV, chess and card rooms, SPA clubs, large conference halls that can accommodate more than 800 people and other places. After completion, it will become the five-star international hotel with the most investment, the highest building, the highest grade, the most complete functions, the most complete facilities and the largest scale in Zhapu.
Taking into account the requirements of the hotel’s grade and environmental quality, Jiaxing Maolv Hotel Co., Ltd. decided to use the building automatic control system to centrally manage the mechanical and electrical equipment in the hotel. After fierce competition, the GREAT-HBA 5 series intelligent DIY management system of Shanghai Great Technology Industrial Co., Ltd., a domestic enterprise, was finally chosen.
As the winner of the Best Building Automation National Brand Award in 2009 and the winner of the Top 10 Domestic Building Automation Brands in 2010, Shanghai Great has its own intellectual property rights and software copyrights for its building control system management platform, and has been successfully applied in more than 200 projects. , Involving residential areas, office buildings, schools, hospitals, factories and other fields, especially the equipment management of the Korea Pavilion of the World Expo, which provides a strong guarantee for the normal operation of the venue.
In the Hangzhou Bay Seaview Hotel project, the system conducts centralized management and system group control for the HVAC system, cold and heat source system in the hotel’s main building and auxiliary buildings. Through the organic combination of computer and modern communication control technology, it can ensure that all kinds of electromechanical equipment in the hotel can work normally and orderly, minimize management personnel and save energy consumption, so that the management and operating costs of the hotel are greatly reduced. The intelligent level of hotel management has been comprehensively improved.
[ad_2]