Case study of 15-in and 16-out parking lot system in Shanghai Pudong International Airport Logistics Park
[ad_1]
Shanghai Pudong International Airport Customs First Supervised Warehouse District, adjacent to the newly built third runway of Pudong International Airport, international standard high quality, 2-story ramp transportation warehouse, with a total construction area of 160,000 square meters. Net height: 8 meters on the first floor, 9 meters on the second floor (with transportation slope), Class C warehouse quickly responds to fire sprinkler system, 1.3 meters elevated unloading platform, maximum ground load of 3 tons per square meter, it is the largest warehouse in the country one.
The intelligent parking lot management system of Shanghai Pudong International Airport Logistics Park implemented by our company this time all adopts non-contact IC card for management, with a total of 15 in and 16 out. All are standard fully offline parking lot management systems. The system architecture uses the most popular CAN bus communication protocol today. All equipment is independently developed and produced by our company and has been widely used.
[ad_2]