Application of RFID in Guangzhou-Shenzhen Railway High-speed Line
[ad_1]
The on-board automatic phase separation control system based on RFID (Radio Frequency Identification) and GPS (Global Positioning System) independently developed by our company. According to the appraisal, the participating experts believe that the system adopts RFID and GPS dual positioning technology to meet the accuracy and reliability needs of electric locomotives during automatic phase separation. The system is ingenious, novel in structure, advanced in technology, safe and reliable, and has strong practicability. It has the leading level of similar systems in China, and it is recommended to realize industrialization as soon as possible and accelerate the promotion and application. The system was successfully installed and operated on various electric locomotives on the Guangzhou-Shenzhen Railway in May 2004.
[ad_2]